chore: release 1.0.6 and keep the live matrix out of the CI gate

The thinking matrix had been running inside make ci all along, which is
not what the design claimed. It takes seven minutes, spends 137 real
calls, and its criteria are statistical, so a network hiccup fails the
build for reasons unrelated to the change under test -- one run died on
three consecutive network errors exhausting the source.

The project already has the mechanism for this: the slow marker, which
addopts excludes by default and the config comments describe as "CI runs
it on demand". Marking the matrix slow brings make ci back down from
seven minutes to ninety seconds while the matrix stays a merge
requirement via -m slow.

The design also claimed e2e does not run in CI. It does: make test runs
pytest over tests/, e2e included, and the existing smoke tests really
call the gateway whenever .env has credentials. Only slow-marked tests
are excluded. Both documents now say so.

Version sources are pyproject and __init__; a test enforces they agree,
and it caught the second one being missed.
This commit is contained in:
2026-08-02 08:12:01 -04:00
parent 48805cb9fb
commit 5eb01a0096
6 changed files with 20 additions and 9 deletions
+10 -3
View File
@@ -42,9 +42,16 @@ from polygateway.providers import DEFAULT_CAPABILITIES, get_capability
_ENV = {k: v for k, v in {**dotenv_values(".env"), **os.environ}.items() if v is not None}
_HAS_SOURCE = any(k.split("__")[0] == "LLM" and k.endswith("__API_KEY") for k in _ENV)
pytestmark = pytest.mark.skipif(
not _HAS_SOURCE, reason="需真实网关凭据: 在 .env 配置 LLM__{PROVIDER}__1__*(本组必须真跑)"
)
# slow: 本组 137 次真实调用、约 7 分钟,且判据是统计性的——网络抖动会让它偶发
# 失败(实测有一次 network_error 连续三次耗尽源)。让它阻断 `make ci` 会把测试
# 变成噪声源,故沿用项目既有的 slow 标记默认排除,合并前用 `-m slow` 显式真跑并
# 存档报告。"不自动门控"不等于"可跳过"。
pytestmark = [
pytest.mark.slow,
pytest.mark.skipif(
not _HAS_SOURCE, reason="需真实网关凭据: 在 .env 配置 LLM__{PROVIDER}__1__*(本组必须真跑)"
),
]
_OUT_DIR = Path("tests/outputs/e2e")
_ROUNDS = int(os.environ.get("PGW_E2E_THINKING_ROUNDS", "10"))