iomgaa abeb09f588 docs: plan the tier work as ten steps that each stand on their own
Ordered so the two type changes land first and everything else consumes
them: capability and wire in parallel, then the five gates, then the two
entry points, then cache key and telemetry, then the transport.

Task 10 exists because the human settled that the capability table is
measured through new-api, not read off a vendor page. Task 1 lands the
documented guess; task 10 replaces it with what the gateway does.