Files
PolyGateway/tests/unit
iomgaa 0477d9534b fix: apply the non-productive stall budget to the ocr loop
Same failure path as the embedding loop: one timed-out attempt drains the
wall-clock window, and the next round without a runnable source declares
the scope dead in _on_no_runnable. All three governance loops now meter
stall the same way.
2026-08-06 09:51:30 -04:00
..