Files
PolyGateway/research-wiki/plans
iomgaa 4534444ad8 docs: plan the est_tokens decoupling in five ordered tasks
The ordering is the load-bearing part. All three changes interlock and
every wrong interleaving fails silently: flipping the usage fallback to
(0, 0) before the settlement points read the derived value refunds the
whole pre-deduction on success, and flipping the embedding transport
before _merge goes three-state mislabels unavailable batches as
measured. So the plan adds the capability first, moves all five call
sites onto it while it is still equivalent, only then lets the third
state take effect, and unbinds the constraint last.

Registers both wiki entries and links the plan to its design.
2026-07-30 05:41:33 -04:00
..