abeb09f588
Ordered so the two type changes land first and everything else consumes them: capability and wire in parallel, then the five gates, then the two entry points, then cache key and telemetry, then the transport. Task 10 exists because the human settled that the capability table is measured through new-api, not read off a vendor page. Task 1 lands the documented guess; task 10 replaces it with what the gateway does.